•       Open pit mining, started in 2016, total volume 268 million BCM
  •       3 x Cat 6030 FS, 3 x Cat 992Ks, 40 x Cat 777D/Gs, 8 x PRD 650M drill rigs.

Status: Ongoing.

Attarat Oil Shale Project, Jordan