- Construction of the tailing’s storage facility, water storage dam and flood protection infrastructure, including concrete works, installation of pipework and HDPE liner.
- 5 x front-end loders; 4 x exca; 12 x trucks; 4 x dozers; 3 x graders; compactors.
Status: Completed